OUR NIGERIAN CONTENT NON-COMPLIANCE REMEDIATION (NCNC-REM)
Date: 21/09/2018
HPCN carried out NIGERIAN CONTENT NON-COMPLIANCE REMEDIATION (NCNC-REM) according to the requirement of NCDMB with the total of One Hundred and Sixteen Thousand, One Hundred and Sixty United State Dollars (116,160.74 USD) to implement the under-listed in the Department of Chemical/Petrochemical Engineering in Rivers State University within a specific period of time.
The implementation processes were kicked-off at the 18th of September, 2018 and thoroughly supervised by NCD inspection team till full execution and handover, which was witnessed by both the NCDMB and Rivers State University school authority.
1. TOTAL REHABILITATION/REPLACEMENT OF NON-FUNCTIONAL PARTS OF 3 IN 1 PULSATING LIQUID- LIQUID EXTRACTION DISTILLATION AND FUNCTIONATING COLUMN IN CHEMICAL/ PETROCHEMICAL LABORATORY OF RIVERS STATE UNIVERSITY SHOWN IN THE PICTURES BELOW.
DISTILLATION COLUMN
2. CARRIED OUT REPAIRS OF THE FOLLOWING LABORATORY EQUIPMENT:
- Atomic Absorption Spectrometer(AAS)
- Moisture Analyser
- Oven
A. ATOMIC ABSORPTION SPECTROMETER (AAS) AFTER THE REPAIRS
B. MOISTURE ANALYZER
C. OVEN
3. OUTRIGHT PURCHASE OF NEW LABORATORY EQUIPMENT SUCH AS
- Hi 83300 Multi-Parameter Photometer
- MRC-PN 120 Laboratory Oven
- MRC-MF16A-19 Muffle Furnace
A. Hi84400 MULTI PARAMETER
B. MRC PN 120 LAB OVEN
C. MRC-MF 16A FURNACE
|